To safeguard the operator and other personnel work
To safeguard the operator and other personnel working on or near a hoisting operation, which of the following precautions should be observed?
A.Keep a load on the hoist until all personnel are finished working
B.Set the load on a movable dolly when transportation may be needed
C.Have one man keep a hand on the load to steady it
D.Insure that the lifting gear capacity is not exceeded
请帮忙给出正确答案和分析,谢谢!
参考解答
正确答案:D
相似问题
活塞销是_______的连接件A.活塞与曲轴B.组合式活塞与连杆C.筒状活塞与连杆D.连杆与曲轴请帮
活塞销是_______的连接件A 活塞与曲轴B 组合式活塞与连杆C 筒状活塞与连杆D 连杆与曲轴请帮忙给出正确答案和分析,谢谢!
The objectives of the ISM Code are to ensure ①safe
The objectives of the ISM Code are to ensure ①safety at sea②prevention of human injury or loss of life③avoidance of dama
Emulsion oils and sodium nitrite are both approved
Emulsion oils and sodium nitrite are both approved additives, but the latter cannot be used if any pipes are or if ally s
办理乘机手续包括办理()等手续。A.安全检查B.客票查验C.托运行李D.领取登机牌此题为多项选择题。
办理乘机手续包括办理()等手续。A 安全检查B 客票查验C 托运行李D 领取登机牌此题为多项选择题。请帮忙给出正确答案和分析,谢谢!
下列关于海关的工作职责正确的是()A.为入出境人员办理预防接种B.实施口岸查控 防止非法入出境C.检
下列关于海关的工作职责正确的是()A 为入出境人员办理预防接种B 实施口岸查控、防止非法入出境C 检查动植物D 查缉走私请帮忙给出正确答案和分析,谢谢!
